UTSA PE Building—Football Locker-room Remodel University CPM Scheduling

University CPM Scheduling UTSA Locker Room Remodel

Project Details:

Location: San Antonio, Texas

Project Value: $540,000

General Contractor: CoField Group General Contractor

Owner: UTSA

Overview:

Precision Scheduling played a vital role in the renovation of the football locker room at the University of Texas at San Antonio by providing the university with CPM scheduling. This project aimed to enhance the football team’s facilities within the Physical Education Building. The renovation covered an area of approximately 3,600 gross square feet (GSF).

Scope of Work University CPM Scheduling

The project involved various upgrades to modernize the locker room. Key renovations included the installation of resin floors and the complete replacement of all ceramic tiles. Precision Scheduling oversaw the university’s CPM scheduling development of the baseline schedule to ensure timely project execution.

Plumbing and Infrastructure Upgrades

Additionally, the construction team replaced plumbing fixtures to improve functionality. Furthermore, they installed new polyvinyl chloride (PVC) roof leaders to enhance drainage. These infrastructure upgrades were crucial for the locker room’s long-term performance.

Structural Improvements

Moreover, the renovation included new stairs and walls to provide better access and space management. These structural enhancements contributed to the overall functionality of the locker room. Precision Scheduling focused on coordinating these elements efficiently throughout the project.

Electrical and HVAC Enhancements

Alongside structural improvements, the project incorporated significant electrical work. The team ensured that the electrical systems met current standards for safety and performance. They also upgraded the heating, ventilation, and air conditioning (HVAC) systems, which enhanced the comfort and air quality within the locker room.

University CPM Schedule Management

Precision Scheduling diligently managed the project’s timeline through updates and adjustments. The baseline schedule served as a foundation for tracking progress. Regular updates kept stakeholders informed about any changes and milestones achieved during the renovation.

In conclusion, Precision Scheduling’s project controls services were essential for the successful renovation of the football locker room. By developing the baseline schedule and providing regular updates, the team ensured that all upgrades occurred efficiently. These improvements significantly enhanced the locker room, providing a modern and functional environment for the football team at the University of Texas at San Antonio. The coordination among various contractors and disciplines highlighted the importance of effective project controls in achieving a successful renovation.