Overview:
Located in Tucson, Arizona, the project had an estimated cost of $7.4 million and consisted of the site preparation for the Fighter Size Paint booth at Davis-Monthan Airforce Base. (2023)
Located in Tucson, Arizona, the project had an estimated cost of $7.4 million and consisted of the site preparation for the Fighter Size Paint booth at Davis-Monthan Airforce Base. (2023)