Construction Dispute Resolution

Construction Dispute Resolution & Forensic Analysis

Construction Litigation & Support

Delays can be quantified, analyzed, and verified with our time-proven methods.

Precision’s construction management professionals deliver solutions to clients requiring niche expertise. These solutions include the preparation and negotiation of Change Order Proposals, Requests for Equitable Adjustments, and Contract Claims.

As Construction Dispute Resolution Experts, our team leverages the knowledge we have gained of the construction industry to assess, identify, resolve, and avoid disputes and claims. Should you encounter a construction claim, Precision utilizes a variety of time-tested and industry-standard methods to validate your claim and entitlement.

Our team of construction professionals can assist with the following:
Claims Management

When challenges arise, it is important to implement the correct techniques to find a resolution while minimizing negative consequences. Should you encounter a construction claim, our team has the appropriate experience and knowledge to assist in validating entitlement and quantifying damages.

Solutions Provided by Precision:
– Request for Equitable Adjustment
– Preparation/Negotiation of Change Order Proposals
– Contract Claims

Standard of Care

What would a reasonably prudent practitioner have done in a similar time and place? Failure to meet the Standard of Care is a common assignment for construction-related litigation experts. Did the architect, engineer, general contractor, construction manager, or sub-contractor fail to meet their contractual expectations?

Are the plans and specifications detailed?
– Do the documents complete their intended purpose?
– Is the contract suitable for construction and has its application been executed properly for construction
?

These questions are left open to interpretation by experts and require a construction professional’s knowledge and expertise to make an evaluation. Precision has the knowledge and experience to evaluate and identify the performance of all responsible parties to determine if the Standard of Care provided was adequate.

Schedule Delays & Disruptions

Delays and disruptions on a construction project can have detrimental effects and often result in disputes between the owner, contractors, subcontractors, and design professionals. Delays are caused by work starting later than planned or in some cases never commencing at all. Identifying and assessing delay damages is critical to defining responsibility and finding a resolution.

By utilizing critical path method (CPM) techniques and contract analysis, PSC can identify and quantify schedule delays and validate the liability of the damages. These techniques also allow PSC to determine if the delay is excusable, non-excusable, compensable, or non-compensable.

Methodologies employed:

As-Planned vs. As-Built Analysis
Time Impact Analysis (TIA)
Windows Analysis


Precision’s delay experts look to identify the type of delay (late start, extended duration, concurrent, pacing, etc.) and determine if a delay is excusable, non-excusable, compensable, and non-compensable. Ultimately, Precision’s experts look to determine the cause and apportion delay to the respective parties. To do so, Precision generally applies the following steps when evaluating construction delays.

Contract analysis
Schedule review and validation
As-built validation and/or daily specific as-built schedule development
Methodology selection
Delay and disruption identification and quantification
Causation analysis
Apportionment

Expert Witness Testimony

Professional skill set to effectively communicate the findings of our report and successfully rebut opposing experts’ findings.

Precision’s Expert Witness, Greg Lee, PMP, PSP, CCC, LEED AP, serves as a reliable source to testify findings in court. With over 15 years in the construction industry, Mr. Lee has testified for several construction claims in Texas, New Mexico, and Washington D.C..

Loss of Productivity

Loss of Productivity in construction can be the result of a multitude of varying causes: Inadequate Planning and Scheduling, Work Conditions, Inefficient Use of Time, Coordination Issues, and more.

When working on a claim involving Loss of Productivity (LOP), Precision will conduct a LOP Analysis and review all project records to validate the cause of the LOP and it’s impact on the project and client.

Cost Evaluation & Analysis

The main aspects of any construction claim are the cost and damages incurred. Precision ensures client confidence by providing cost analysis and understanding of Field Overhead, Extended Home Overhead, Liquidated Damages, and more.

Force Majeure Claims

Unprecedented and unforeseen acts or events that prohibit work from being performed to project specifications and contracts.

Precision will meticulously review contract documents and all records that validate the prohibited justifications for forced stopped work.

Benefits

Phasing Approach
Online Webinars
Location
Collaboration

Precision proudly fosters a phasing approach when assisting our clients in construction litigation. This time-tested method allows our clients to be more integrated and provide feedback as analysis, findings, and reports are developed. At Precision, we take pride in ensuring client confidence.

Our Experience

Our seasoned consultants have walked varying paths in the construction industry prior to building their repertoire of consulting. Project Management and Scheduling have been the foundation of our team’s experience.

With a meticulous and driven team, we’re proud of our undeniable track record in varying sectors and industries in construction.

JHS – South Modernization

Project Cost: $1.5 B

Location: Miami, FL

Settled in Mediation

Repair POL Piping, DFSP

Project Cost: $41.9 M

Location: Hakozaki, Japan

Forensic Schedule Analysis

Tacara at Dove Creek

Project Cost: $39.1 M

Location: San Antonio, TX

Forensic Delay Analysis

RELATED ARTICLES

What if Something Happens that You Don’t Plan For?

Good question. The answer… plan for it. You probably wouldn’t immediately think of The Art of War as a guide to construction scheduling, but take a look at this quote: “Victory belongs to the side That scores most In the temple of calculations before battle.” Another way of translating that is: “Success belongs to the… Read more »

Read the Article

Need Construction Claims Expert Near You?

At Precision, our consultants meet with the project team via virtual meetings from the start of the claims process and periodically through commencement. Our expert witness will travel as needed if a claim makes it to trial.